ID 528329

Archived

2017 Sewer Lining Project, Samll Diameter, Seattle WA

King County

Owner Reference: 2019-079

Bid Date: 03/04/2020 at 02:00pm

Estimate: $3,336,000

This Project consists of 68 sites (95 pipe segments) for sewer mainline Cured-in-place pipe (CIPP) repairs located at various areas in the City of Seattle. This project will employ the Cured-in-place pipe (CIPP) installation method with fiberglass lining installation with ultraviolet light to rehabilitate existing sewer and combined sewer and storm pipes at various locations in Seattle. The mainline pipes being rehabilitated are 8 inches to 15 inches in diameter. This Project consists of the following elements of work: traffic control, bypass pumping, cleaning and inspection of sewer pipe, removal of debris, removal of intruding lateral piping, installing pre-liner, installing and molding of the CIPP liner to the host pipe, reinstatement of laterals, and pre and post lining CCTV inspection.

City of Seattle, Public Utilities

Kai Fan
 (206) 684-5942
 Login or create an account To view email

Published 02/11/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.