ID 509871
Archived
Skagit County
Owner Reference: TS-2019-001
Bid Date: 09/05/2019 at 11:00am
Estimate: $350,000
This contract provides for the improvement of portions of Anderson Road in Mount Vernon from between Old Highway 99 through the roundabout at Cedardale and portions of Cedardale to the South and North of the roundabout. The project includes the removal of bituminous pavement, splitter curbing, guideposts, pavement markers, sidewalk, curb ramps, curb and gutter, signage, and other items from the roadway. The project also includes construction and installation of hot mix asphalt roadway, roundabout central island, roundabout splitter islands, roundabout truck apron, mountable curb, traffic curb and gutter, flexible guideposts, pavement markers, thermoplastic pavement markings, signage, paint striping, adjusting and or installing new manhole rings and covers, adjusting water valve boxes, protecting survey monuments, providing temporary traffic control and other work.
City of Mount Vernon, WA
Darin Christen
(360) 336-6204
(360) 336-0633
Published 08/20/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.