ID 504759
Archived
Los Angeles County
Owner Reference: B2019-36, T-171
Bid Date: 07/24/2019 at 03:00pm
Estimate: $137,000 - $150,000
or Angel Lotus at ALotus@TorranceCA.gov. This project provides modification to traffic signal at various locations of the city to enhance traffic circulation and safety. It will construct the following: Protected left-turn phasing at the intersection of Palos Verdes Blvd at Catalina Ave/ Via Monte D’oro; Installation of pedestrian push buttons at Palos Verdes and Calle Miramar; Installation of pedestrian push buttons at Palos Verdes and Calle Mayor; Removal of left-turn phasing for westbound Skypark Dr at Medical Center Dr; Removal of flashing yellow beacon near Del Amo Blvd and Wayne Ave; Installation of solar red stop beacons at Van Ness Ave and 171th St
City of Torrance
Steve Finton or Angel Lotus
310.781.6900
310.781.6902
Login or create an account To view email
Published 07/01/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.