ID 498866
Archived
Carson City County
Owner Reference: 1819-244
Bid Date: 06/03/2019 at 11:00AM
Estimate: $6,350,000
The project consists of installation of 24” water main and related appurtenances, installation of 16” water main and related appurtenances, pre-fabricated booster pump station installation, installation of fiber optic conduit bank with pull string, installation of sidewalk, curb ramps, curb and gutter, roadway reconstruction as well as asphalt and concrete patching. The project includes all common phases of construction customarily associated with this type of project. Sealed bids must be submitted in accordance with the bid documents, drawings and plans, specifications and special conditions related hereto. State prevailing wages are required for this project. Bonds required.
City of Carson City Nevada
Carol Akers
(775) 283-7362
(775) 887-2107
Login or create an account To view email
Published 05/10/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.