ID 504780
Archived
Collin County
Owner Reference: 0412-PGB-02-CN-PD
Bid Date: 07/24/2019 at 10:00am
Pre-Bid: 07/16/2019
5900 West Plano Parkway, Plano, TX NTTA Board Room.
The North Texas Tollway Authority is inviting bids for all labor, tools, equipment, and expenses to provide the mitigation of erosion along the EB/SB President George Bush Turnpike at Campbell Road. Construction includes adding velocity reducing concrete baffles to existing flumes, construction of curbed concrete flumes, and installation of rock riprap along all flumes. Work also includes removing and installing new metal beam guard fence (MBGF) with an end treatment and concrete mow strip. Incidental construction shall include minor excavation, removal of miscellaneous concrete and existing rock riprap, and repair and adjustment of irrigation lines and valves. Bonds required. Prevailing wages apply. Time to complete is three months.
North Texas Tollway Authority
Michael Lunger
(214) 461-2000
(972) 930-3211
Login or create an account To view email
Published 07/01/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.