ID 494410

Archived

Everest WRF Clarifier 1, 2 & 4 Ductbank Replacement Project, Cape Coral FL

Lee County

Owner Reference: ITB-UT19-49/KR-0-2019/KR

Bid Date: 05/15/2019 at 01:00pm

Pre-Bid: 04/18/2019
Nicholas Annex Building Room A200 - Green Room 815 Nicholas Parkway E. Cape Coral, Fl 33990

The Work consists of furnishing all labor, equipment, and materials for the construction of the facilities consisting of, but not limited to, the following: It is the intent of this project to remove and replace all power, instrumentation and control conduit, conductors and cables to existing clarifiers 1, 2 and 4. Maintain power & control to existing clarifiers throughout construction. Demolition of existing non-encased clarifier 4 ductbank systems.

City of Cape Coral

Kathy Rose
 (239) 574-0411

Published 04/03/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.