ID 494141
Archived
Shasta County
Owner Reference: 610514
Bid Date: 05/09/2019 at 11:00AM
Pre-Bid: 04/25/2019
Meet at the main entrance at the Fall River Mills Airport.
Estimate: $650,000
6.8%DBE goals.The project, in general, consists of cleaning, surface preparation, crack seal, asphalt slurry seal and surface marking of runway 2-20 and taxiway connectors. Additionally, pavement rehabilitation on Airport Way will include cold milling pavement conforms, 1.5-inch asphalt concrete leveling course, 2-inch asphalt concrete overlay and Class 3 aggregate base shoulder backing. In addition to construction activities the Contractor shall be responsible for implementing and monitoring a “Construction Safety and Phasing Plan” as included with the work to be performed. Bonds required. Prevailing wages.
County Of Shasta
Kevin Maple
(530) 225-3834
(530) 225-5667
Login or create an account To view email
Published 04/30/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.