ID 513222

Archived

Fire Station #17 Slab Replacement Project, Atlanta GA

Fulton County

Owner Reference: ITB19005

Bid Date: 10/21/2019 at 02:00PM

Pre-Bid: 10/03/2019
Fire Station #17, 8675 Ridge Road, Fairburn GA

All concrete work shall be performed in accordance with accepted industry standards and codes for cast-in-place concrete including, but not limited to, temperature recommendations, reinforcing, measuring, transporting, and placing of concrete. 2 Mobilization of equipment and crews within seven days of NTP. Provide means and methods for all construction phases.The Contractor shall saw cut where required to create a clean edge and remove and replace the existing defective driveway. After the removal of the existing defective driveway the existing GAB shall be compacted to 98% compaction. Where necessary additional GAB may be added to meet the required thickness of 8”. Where no GAB exist no density test shall be required of soil provided the virgin soil is moist and compacted to the satisfaction of the City Engineer. Installation of #4 rebar dowels must be used to join all slab sections and other existing slabs or asphalt. 6 x 6 x 10 gauge. welded wire mesh shall be installed in all slabs. Expansion joints will be saw joints and shall be soft cut and shall be spaced no more than 10 feet apart. Saw cuts shall be made within 4-12 hours after concrete finishing. • Saw cuts shall have a depth that is equal to 25% of slab thickness. Concrete thickness will be 7” @ 5000 psi. All concrete shall have a minimum compressive strength of 5000 psi at 28 days. • Concrete shall have a light non-slip broom textured finish.Barricades and necessary safety devices will be the responsibility of vendor.Vendor shall use 811 for utility locations.

City of South Fulton

Drexal Paulk
 (470) 809-7737
 Login or create an account To view email

Published 09/23/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.