ID 499068

Archived

Foster Road Phase III Project, Bexar Co., TX

Bexar County

Owner Reference: 2019-005

Bid Date: 06/14/2019 at 10:00am

Pre-Bid: 05/22/2019
Bexar County Public Works Office, 1948 Probandt Street, San Antonio, Texas, 78214

Estimate: $10,703,289

The Alamo Regional Mobility Authority is inviting bids for all labor, tools, equipment, and expenses to construct Phase III of the Foster Road Project, which begins at Houston Street (FM 1346) and extends north approximately 1.5 miles to IH 10. The Project will expand Foster Road from an existing two-lane roadway to a four-lane roadway consisting of two 12-foot travel lanes with six-foot shoulders in each direction. Additional work includes bridge construction, drainage improvements, traffic signal installation and other operational improvements. The Project includes SAWS Water, SAWS Sewer, and CPS Gas joint-bid items of work. Bonds required. Prevailing wages apply.

Alamo Regional Mobility Authority

Christopher Trevino
 (210) 335-7076
 (210) 335-6713
 Login or create an account To view email

Published 05/13/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.