ID 509225

Archived

Government Center & Central Plant: Re-Roofing & Sealant Replacement Project, Las Vegas, NV

Clark County

Owner Reference: 605404

Bid Date: 09/20/2019 at 02:00pm

Pre-Bid: 08/20/2019
Gold Conference Room, Fourth Floor, Clark County Government Center, 500 South Grand Central Pkwy, Las Vegas NV

Estimate: $5,798,931 - $6,104,138

Construction includes but not limited to: selective demolition of the existing multi-ply roofing; roof anchor system & all sandstone polyurethane sealant; addition of roof hatch, guardrails; installation of a Ketone ethylene Ester (KEE) Thermoplastic Roofing Membrane System; wind vented roof system; new roof anchor system; installation of new medium & low modulus silicone sealant at all exterior sandstone surfaces; patching, painting & accoustical ceiling repairs as needed. Bonds required.

County of Clark Nevada

Sandy Moody-Upton
 (702) 455-2897
 (702) 386-4914

Published 08/14/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.