ID 512075

Archived

Governor's Office of Storm Recovery University Settlement Society Resiliency Improvements and Asbestos Abatement Project, New York, NY

New York County

Owner Reference: 3339109999/CR18

Bid Date: 10/17/2019 at 02:00pm

Estimate: $1,050,000 to $1,500,000

The work will include the partial demolition of the existing water tank room, removal of potentially asbestos containing material and lead paint abatement, removal of the existing ceiling below the room to allow for examination of the existing steel building frame, possible reinforcement of the roof steel reconstruction of the roof room to house the generator, construction of a new fire rated room for the transfer switches in the cellar, electrical work to install the ATS’s modification of existing fuel oil piping the fuel tank to install a new fuel pumping system, installation of double wall fuel oil piping to the generator room day tank. Installation of a fuel tank monitoring and leak detection system, miscellaneous electrical work in the building as detailed in the drawings and plumbing work to install backwater valve on the sanitary sewer line from the building. This project encouraged MBE/WBE participation.

Dormitory Authority of the State of New York

Peter Jackson
 (212) 273-5108
 Login or create an account To view email

Published 09/12/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.