ID 495582

Archived

Hotel Circle CI & AC Accelerated Replacement Project, San Diego, CA

San Diego County

Owner Reference: K-19-1846-DBB-3

Bid Date: 05/15/2019 at 02:00pm

Estimate: $2,175,000

Scope of Work: The replacement of existing asbestos cement and cast iron water mains with new steel water main via tunneling method and PVC water main via replace-in-place. Associated improvements will include curb ramps, street resurfacing and other work and appurtenances. Project duration is 230 working days. Subcontractor participation percentages apply to this contract. ELBE: 13.2%, SLBE: 9.1% Bonds required. Prevailing wages apply. Good Faith Effort documentation applies.

City of San Diego, Public Works, CA

Taylor Cox
 (619) 533-3033
 Login or create an account To view email

Published 04/11/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.