ID 526391
Archived
Cobb County
Owner Reference: M004879
Bid Date: 02/21/2020 at 10:00am
1.287 Miles of Milling, Inlay and Plant Mix Resurfacing on Sr 5 Spur Beginning at I-75/SR 401 Northbound Ramp and Extending South of Kurtz Rd. Pavement markings shall be provided on all surfaces that are placed over existing markings. Interim and final markings shall conform in type and location to the markings that existed prior to resurfacing unless changes or additions are noted in the Contract. The replacement of parking spaces will not be required unless a specific item or note has been included in the Contract. Any work to make additions to the markings that existed prior to resurfacing is to be considered as extra work. Removing and disposing trees, brush, stumps, logs, grass, weeds, roots, decayed vegetable matter, poles, stubs, rubbish, refuse dumps, sawdust piles, and loose boulders of 1 yd³ (1 m³) or less existing outside of the construction limits, debris resting on or protruding through the ground surface, or appearing on the Right-of-Way before final acceptance of the work. This work includes constructing a cement stabilized base course by pulverizing the existing flexible pavement, underlying base and subgrade, and mixing with Portland cement. Construct according to these Specifications and to the lines, grades, thickness, and typical cross-sections shown on the Plans or established by the Engineer. This project encouraged MBE/WBE participation.
Georgia Department of Transportation
Robbie Bridges
(404) 631-1148
Login or create an account To view email
Published 01/28/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.