ID 534450
Archived
King County
Owner Reference: 2020-014
Bid Date: 04/22/2020 at 02:00pm
Pre-Bid: 04/07/2020
Please meet at the Joint Training Facility Classroom Training Building Main Entrance, 9401 Myers Way South, Seattle, WA 98108.
Estimate: $297,945 not including tax
Replace two (2) boilers and associated gas and hydronic piping, add VFDs to existing pumps. Replace existing, air separator, flow control valves, boiler flue and intake vent. Replace gauges and sensors. Replace exhaust fan. Provide control modifications. Provide duct modifications to existing VAV box and rebalance system. Commission system and controls for a complete and operational system.
City of Seattle, Admin Svcs, WA
Everett Spring
(206) 684-8197
Login or create an account To view email
Published 04/01/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.