ID 498690

Archived

Lakemont Blvd SE Repairs & 164th Ave SE & SE Newport Way Mini-Roundabout Project, Bellevue WA

King County

Owner Reference: 19040

Bid Date: 05/23/2019 at 02:00pm

Estimate: $1.2M - $1.5M

Work contemplated to be performed under this contract is as follows: • Remove Asphalt Concrete Pavement, Cement Concrete Curb, Gutter, and Sidewalk • Remove and Reset Guardrail • Remove Structures and Obstructions • Roadway Excavation • Install Geotextile and Geofoam • Construct Asphalt Pavement • Cement Concrete Curb, Gutter, and Sidewalk • Construct Cement Roundabout Central and Splitter Islands • Construct Pigmented Patterned Cement Concrete Pavement • Grind and Overlay Asphalt Pavement • Channelization and Signing • Install Irrigation System • Top Soil Type A Installation • Storm Drainage Improvements • Water Main Installation • Property Restoration and Miscellaneous Work

City of Bellevue, WA

Daniel Lam
 (425) 452-7876
 Login or create an account To view email

Published 05/10/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.