ID 499027

Archived

Mallard Creek Water Reclamation Facility Reliabilty And UV Improvements Reclaimed Water & Hypochlorite Improvement Project, Charlotte NC

Mecklenburg County

Owner Reference: FY18-CMAR-02

Bid Date: 06/05/2019 at 04:00pm

This bid package generally consisting of the following components: Replace the Chemical Building. Increase the Chemical Building’s existing footprint to store and feed future effluent filter cleaning chemicals. Refurbish the existing pump station meter vault structurally and mechanically. Provide a second flow meter and vault at the pump station for redundancy. Rehabilitate the NPW Enclosure and sample station. Replace the hypochlorite feed pumps and all instruments in the Chemical Building and pipe the new hypochlorite system to the new effluent disk filters (hypochlorite is the cleaning chemical for the filters). This project encouraged MBE/WBE participation.

City of Charlotte (Charlotte Water)

Abby Dolan
 (704) 399-2221
 Login or create an account To view email

Published 05/13/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.