ID 509324
Archived
Palm Beach County
Owner Reference: ITB-W1826-0-2019/SFM
Bid Date: 08/10/2019 at 02:00pm
Pre-Bid: 08/22/2019
Jupiter Water Treatment Plant Utilities Administration Conference Room 17403 Central Blvd, Jupiter, FL 33458
Provide all labor, equipment, materials, and tools necessary to perform cured in place pipe lining (CIPP) in ten (10) existing perforated corrugated aluminum exfiltration trench pipes ranging in diameter from 18” to 30” and to rehabilitate ten (10) drainage catch basins and ten (10) drainage control structures in the Jupiter Landings Subdivision, including but not limited to plugging existing drainage pipes, dewatering, cleaning existing pipes for lining, cleaning existing structures for rehab, pre- and post- lining television inspections, +/- 760 LF of 18-inch CIPP, +/- 380 LF of 24-inch CIPP, and +/- 450 LF of 30-inch CIPP, structure repairs, concrete baffle repairs, tree/vegetation/root removals, installation of +/- 80 LF geo-textile tube for lake bank stabilization with backfill and compaction, +/- 60 SY of concrete sidewalk replacement, hauling and disposal of all debris generated by Contractor’s work, site restoration, additive alternate bid items including cleaning, CIPP and video inspections for one (1) 30” diameter lake interconnect pipe consisting of a combination of corrugated aluminum pipe and reinforced concrete pipe, removal and replacement of two catch basin skirts and 20 LF of concrete valley gutter, all other incidentals, labor and materials required to complete the Work.
Town of Jupiter
Steven Montemayor
(561) 741-2372
Published 08/15/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.