Overhead Transmission Construction for TxDot FM 2818 Project Bryan,TX

Brazos County

Owner Reference: Bid #008-02-20

Bid Date: 12/13/2019 at 02:00pm

Pre-Bid: 12/05/2019
BTU System Operations Center, located at 2200 Fountain Avenue, Bryan Texas 77801

The project consists of the installation of one new riser structure and two new 90 degree deadend poles. Te riser structure and one 90 degree deadend pole shall be installed on the North side of FM2818, ease of Luther St. W the other 90 degree deadenedstructure shall be installed on the south side of FM2818 East of Luther St. West.bonds required. Prevailing wages. Q&A due by 12/11/19 by Noon.

Bryan Texas Utilities

Phebe Mosley
 (979) 295-5501
 (979) 209-5507
 Login or create an account To view email

Published 11/24/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.