ID 493983
Archived
Cameron County
Owner Reference: VAL19176
Bid Date: 04/30/2019 at 11:00AM
Pre-Bid: 04/09/2019
Valley International Airport, 3002 Heritage Way, 3rd Floor, Harlingen, Texas 78550
Estimate: $1.5 - $2.5 Million
In general, the Project Base Bid requires procurement, fabrication, installation of two (2) three-tunnel type apron drive passenger boarding bridges as well as a fixed bridge section of tunnel to be used as a walkway to the apron drive bridge. Each passenger boarding bridge is to be provided with a point of use direct expansion preconditioned air system and combination a 400Hz and 28 vDC solid state ground power unit. The work shall also include removal / disposal of existing passenger loading bridge; & relocation of an existing passenger boarding bridge. There will be additive alternate bids for up to two (2) additional bridges. The proposed construction schedule for installation of a new passenger boarding bridge at Gate 1 will be a factor in the evaluation of bids. The need for an additional operational passenger boarding bridge is immediate. The construction schedule for installation of the remaining passenger boarding bridges will not be a factor in the evaluation of bids. Bonds required. Prevailing wages apply.
Valley International Airport, TX
Construction Services
(214) 217-2236
Login or create an account To view email
Published 03/31/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.