Pavement Rehabilitation - Denkinger Road Project Concord,Ca

Contra Costa County

Owner Reference: PJ2459

Bid Date: 02/20/2020 at 02:00pm

Estimate: $1.1 Mil

The work to be done in general consists of mobilization, traffic control, water pollution control program, potholing, rubberized hot mix asphalt (HMA), hot mix asphalt (HMA), cold planing, pulverization and grading, quicklime/cement soil treatment, removal and replacement of concrete curb and gutter, sidewalk, valley gutter and curb ramps, pruning and removal of tree roots, root barrier installation, lowering and adjustment utility covers to finish grade, removal and replacement of striping and pavement parking, removal of traffic loop detectors, and installation of video detection system and all other work. Bonds required. Prevailing wages. Q&A due by 02/11/20 at 5PM.

City Of Concord

Ali Hatefi
 (925) 671-3284
 (925) 798-0636
 Login or create an account To view email

Published 01/25/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.