ID 496672

Archived

Ralston Avenue Corridor Improvement Project Segments 1 & 2, Belmont, CA

San Mateo County

Owner Reference: 2019-578

Bid Date: 04/30/2019 at 02:00pm

Pre-Bid: 04/16/2019
Belmont City Hall

Estimate: $2,460,000

The City of Belmont is inviting bids for all labor, tools, equipment, and expenses to provide Pavement rehabilitation, slurry seal, Signing and striping, curb ramps, sidewalk, signal modification, Pedestrian Hybrid Beacon installations, and Class 1 bicycle paths. Pedestrian and bicycle improvements along Ralston Avenue between US 101 NB off ramp and South Road, Emmett Avenue between El Camino Real and 6th Avenue, El Camino Real between Ralston Avenue and Emmett Avenue, Old County Road between Ralston Avenue and Masonic Way, Masonic Way between Hiller and Old County Road, 6th Avenue between El Camino Real and Emmett Avenue, Twin Pines Park Class 1 bicycle pathway from South Road to the east of Twin Pines Park. Time to complete is 120 days. Bonds required. Prevailing wages apply.

City of Belmont, Public Works, CA

John Tallitsch
 (650) 637-4701
 (650) 593-8394
 Login or create an account To view email

Published 04/22/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.