ID 524794

Archived

Ramp 19 & Taxilane A3 Pavement Replacement Project, Atlanta GA

Fulton County

Bid Date: 02/20/2020 at 02:00pm

Pre-Bid: 01/23/2020
Tech Campus 1255 South Loop Road, College Park, GA 30337

Ramp 19 & Taxilane A3 Pavement Replacement. The project will include demolition and replacement of concrete and asphalt pavements on Ramp 19, Taxilane A3 and a portion of the NLVR. Bidders are required to furnish a Bid Guarantee in the amount of five percent (5%) of the total Bid amount. Bidders offering alternative Bids shall provide a guaranty for the largest total Bid amount. The guaranty shall be a bid bond using Form 3, or a certified check. The bid bond shall be secured by a guaranty or a surety company listed in the latest issue of U.S. Treasury Circular 570. This project encouraged MBE/WBE participation.

City of Atlanta, Georgia

Stella Floyd
 (404) 980-9805
 Login or create an account To view email

Published 01/13/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.