ID 499756

Archived

Sam Houston Tollway PFC Overlay Replacement Project, Houston, TX

Harris County

Owner Reference: Contract 240 Job No. 19/0153

Bid Date: 06/10/2019 at 02:00pm

Pre-Bid: 05/28/2019
Harris County Toll Road Authority (7701 Wilshire Place Dr. Houston, TX 77040) Conference Room 418

Estimate: $4,900,000

The Harris County Toll Road Authority is inviting bids for all labor, tools, equipment, and expenses to replace the thin-bonded permeable friction course (PFC) overlay from US 290 to SH 249, and fault repair at the Sam Central Toll Plaza. Bonds required. Prevailing wages apply.

Harris County Toll Road Authority, TX

Matt Kainer
 (713) 587-7835
 (713) 587-7890
 Login or create an account To view email

Published 05/20/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.