ID 529538

Archived

San Diego Mission Rd W/O Fairmount Ave Sidewalk S/S Project, San Diego, CA

San Diego County

Owner Reference: K-20-1839-DBB-3

Bid Date: 03/24/2020 at 02:00pm

Estimate: $630,000

The work includes construction of new 4 to 5-foot wide sidewalk along the southside of San Diego Mission Road from Fairmount Avenue to the San Diego Mission Road Overcrossing of the San Diego River. This also includes the installation of new pedestrian curb ramps, driveway apron, and curb and gutter within the sidewalk limit. In addition, there will be slurry seal and restriping of San Diego Mission Road between Rancho Mission Road and Fairmount Avenue to create a new buffered bike lane. Project duration is 91 working days. Bonds required. Prevailing wages apply. Total maintatory DBE participation is 14.4%

City of San Diego, Public Works Contracts, CA

Ron McMinn
 (619) 533-4618
 Login or create an account To view email

Published 02/20/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.