ID 534060
Archived
Whitman County
Bid Date: 04/07/2020 at 02:00pm
Pre-Bid: 03/25/2020
Join Zoom Meeting Video from PC, Mac, Linux, iOS, or Android: https://wsu.zoom.us/j/805813545
Join by Telephone: 253-215-8782
Estimate: $160,000 – $180,000
Bid Open Zoom Meeting ID: 805 813 545. Construct a 10-foot wide asphalt sidewalk approximately 1,500 LF from the intersection of Fairway Lane and Orchard Dr. to the intersection of Valley Rd and Orchard Dr. on the Pullman Campus of Washington State University. Remove existing asphalt and concrete sidewalk. Construct ADA crossings where indicated. Replace existing curb cuts where indicated with new curb. Install conduit for future pedestrian light fixtures along entire path. 60 days
Washington State University, Pullman
(509) 335-9000
Login or create an account To view email
Published 03/28/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.