ID 512656

Archived

Street Scape West 3rd Street Project, Rome GA

Floyd County

Owner Reference: 034-19

Bid Date: 09/19/2019 at 03:00PM

The contract shall consist of the removal and replacement of existing concrete sidewalk and curb and gutter, along with the installation of a new catch basin, 15-inch storm pipe, and electrical conduit. Handicap ramps at all street intersections will be required to be constructed in full and complete compliance with GDOT Standard Details as well as current ADA requirements. All concrete removed from project shall be delivered to City of Rome Pipe Yard on Vaughn Road.All Bids must be accompanied by the Bidder's Declaration, Non-Collusion Affidavit, Certificate of Non-Discrimination, Bid Bond, SAVE, etc. and all other contract documents included within the Contract Documents required for bidding the project. The bid bond accompanying the bid must be in an amount of not less than 5% of the total amount of the bid.

City of Rome

Johnna Allen
 (706) 236-4460
 (706) 236-4548
 Login or create an account To view email

Published 09/18/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.