ID 495380
Archived
Alameda County
Owner Reference: P.W. 04-19-18
Bid Date: 05/01/2019 at 01:00pm
Pre-Bid: 04/22/2019
City Hall West, 950 W. Mall Square, Room 156, Alameda, CA 94501
Estimate: $680,000
The project consists of removing and replacing streetlight conduits, conductors, streetlight pull boxes, streetlight foundations, and other items shown to be constructed on the contract drawings or specifications, including repair, and reconstruction of existing improvements affected by the Work, and incidentals for complete and usable facility. The work to be performed is on various streets, including Gibbons and Southwood, within the City of Alameda, Ca. Work to be completed in 80 working days. Bonds required. Prevailing wages apply.
City of Alameda, Public Works, CA
Erin Smith
(510) 749-5840
(510) 749-5867
Login or create an account To view email
Published 04/10/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.