ID 533794

Archived

T32-D2-PavePres-SR 150 McDuffie-103694 Project, Atlanta GA

Wayne County

Owner Reference: 48400-DOT0001965

Bid Date: 04/09/2020 at 05:00PM

This project consists of Thin-Lift Leveling, Striping, and RPM’s on State Route 150 from MP 0.00 to MP 5.42 in McDuffie County. All existing RPM’s shall be removed prior to Thin-Lift Leveling. All costs associated with this work shall be included in the overall bid price. The existing 5” centerline and edgeline pavement markings shall be replaced as 5” paint pavement markings for the full length of pavement preservation operations. Temporary centerline and edgelines shall be replaced according to Special Provision Section 150. Final centerline and edgelines shall be according to the Standard Specification Section 652. RPM’s (Including any Type 10’s) shall be replaced for the full length of pavement preservation operations. RPM’s shall be placed according to Construction Detail T-15A. Thermoplastic pavement markings damaged by pavement preservation operations shall be replaced in kind. Thermoplastic shall be replaced according to Standard Specification Section 653. Thermo includes stopbars, arrows/words, crosswalks, hatching, R/R symbols, etc. The contractor is responsible for visiting project site to determine the amount/type of pavement markings needed. All costs for pavement markings will be paid for by centerline mile and RPM’s (all types) shall be paid for by each. Contractor must submit a bid bond or proposal guaranty for each bid submitted to the Department. Bid bonds or proposal guarantees not received by the Department before the due/close date and time will not be accepted and bid rejected.

Georgia Department of Transportation

Timothy Swink
 (404) 631-1148
 Login or create an account To view email

Published 03/25/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.