ID 494190

Archived

Taxiway P Project, LAX, CA

Los Angeles County

Owner Reference: 36270

Bid Date: 05/21/2019 at 02:00pm

Pre-Bid: 04/30/2019
Los Angeles World Airports, Clifton A. Moore Administration East Building, Samuel Greenberg Board Room, 1 World Way, Los Angeles, CA 90045

Taxiway P construction project consists of the construction of a north-south taxiway west of Taxiway R connecting to Taxiway E on the north and Taxiway B on the south, Connecting Taxiway R2 between Taxiway P and Taxiway R, and Taxiway D extension outside of Taxiway P object free area to the west. Term: 3 years. Period of Performance: 470 calendar days. DBE Program requirements. Bonds required. Prevailing wages apply.

Los Angeles World Airports

Jose Carlos
 310.646.7390
 310.646.9625
 Login or create an account To view email

Published 04/03/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.