ID 532612

Archived

Terminal 3 Maintenance Dredging Project, Port Angeles WA

Clallam County

Owner Reference: 11-2-T3-M0

Bid Date: 04/15/2020 at 02:00pm

Pre-Bid: 03/23/2020
at the Port's Administration office.

Estimate: $1.4M

The work required for this project includes: maintenance dredging of 15,300 cubic yards of sediment at the Terminal 3 Berth of the Port of Port Angeles (Port) in the Port Angeles Harbor in Port Angeles, Washington. The project requires berth dredging to elevation -45 feet mean lower low water (MLLW) to prevent vessel grounding at Terminal 3 berth as shown on the Drawings. Material re-handling from barge to truck at Terminal 3, transportation from the offloading site to the upland disposal site will be required. Maintenance dredging to -45 feet MLLW last occurred in 1978.

Port of Port Angeles

Chris Hartman
 (360) 457-8527

Published 03/15/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.