ID 501989

Archived

Tiffany Square Apartment Boring/ Installation of HDPE Conduit Project, Rocky Mount NC

Edgecombe County

Owner Reference: 320-052419DH

Bid Date: 06/26/2019 at 02:00pm

Pre-Bid: 06/12/2019
331 S. Franklin Street, Rocky Mount NC

The awarded vendor will be responsible for but not limited to: Installation of new conduit by directional drill or open trench were directional drill isn’t a practical option. Installation of approximately 5,000 feet of new 2” HDPE conduit. Locating to the best of their ability private utilities using ground penetrating radar. The City will also work with customer to locate private utilities throughout this project. Remove trash or debris, generated by their work, from each job site and dispose of it properly per state and local regulations and policies. All work is to be performed in a safe manner in compliance with all accepted common industry practices and all OSHA, federal, state and local regulations. Any damage(s) caused by the Company awarded the contract while performing the contract requirements shall be the sole responsibility of the Company and shall be remedied by the Company before payment is rendered by the City. The awarded vendor will be representing the City of Rocky Mount and shall always display a professional appearance, consisting of FR uniforms of at least 4 ATPV as well as all other NESC or OSHA required Personal Protective Equipment (PPE). PPE shall always be worn by the Company employees. All work performed inside the transformer shall be done by a qualified employee. Work will not be given to a sub-contractor without the expressed written consent of the City of Rocky Mount Electric division. Landscaping and restoration in all disturbed areas of the project to similar or better condition in accordance with the following: Apply topsoil and fertilizer, spreading topsoil w/ a rototiller or suitable equipment. After tilling the area, rake and grade to final grade with gentle slopes for adequate drainage. The finished grade shall be even and uniform w/ sidewalk and curbs or borders. Seeding - seed should be of same variety of the existing grass, shall include appropriate seed for environment and be applied using a seeder or broadcast spreader. Cultivate the area to a depth of six (6) inches removing weeds, stones, sticks and clods larger than 2" in diameter. Top dressing to be applied immediately following seeding and will be either hydro mulch or straw. If straw is the selected top dressing, it should be partially imbedded into the soil with a crimper or similar implementation tool. Where sod is present, it shall be carefully removed and stored. Sod shall be reinstalled on well-tamped soil after work is completed. The City reserves the right to adjust the estimated 5,000 feet of boring to be performed, should it become necessary. Address all traffic control concerns, as required by the city representative. The City will not supply traffic control devices. Repair to the roadway, sidewalks and curbs if it is damaged or cut for locating and or construction. Complete project within 60 calendar days The City will be responsible for the: Supply all 2” HDPE conduit. This project encouraged MBE/WBE participation.

City of Rocky Mount

Debra Harris
 (252) 972-1319
 Login or create an account To view email

Published 06/06/2019 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.