ID 528416

Archived

Tree Root Damage Repair Project, Savannah GA

Chatham County

Owner Reference: 7695

Bid Date: 03/25/2020 at 01:30am

Pre-Bid: 02/25/2020
Coastal Georgia Center, 1st floor conference room, 305 Fahm Street Savannah GA 31401

The purpose of these specifications is to describe requirements for the repair of pavement, curb, and sidewalk damaged by the intrusion of tree roots. Meter Boxes In performing demolition of the sidewalks, care must be taken in protecting the existing water meter boxes and lids, and adjacent sidewalk. The meter boxes shall be reinstalled to the exact grades of the new concrete sidewalks. The contractor at no extra cost to the owner shall replace any meter boxes and/or lids broken by the contractor’s negligence. Existing meter boxes and lids that were broken when work commenced will be provided by the City and installed by the contractor. Excavation and/or Removal of Existing Sidewalk When removing damaged sections of sidewalk and abutting sections are to remain, the existing joint (s) must be saw cut full depth to a neat edge with a masonry saw. This will isolate vibrations from jackhammers and prevent damage to areas not to be removed. Any sidewalk not designated for removal but damaged by contractor shall be replaced at contractor's expense. Excavate the designated areas of sidewalk, trim, and prepare subgrade to the required grade, if necessary add material, ensuring that the resultant surface is well compacted (98% Standard ASTM D-698). Remove all concrete, rubble, organic material, and foreign matter and deposit off-site at a licensed landfill disposal site. This project encouraged MBE/WBE participation.

City of Savannah

Ann Cannon
 (912) 651-6424
 Login or create an account To view email

Published 02/12/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.