ID 504811
Archived
El Paso County
Owner Reference: Bid 19-028
Bid Date: 07/25/2019 at 02:00pm
Pre-Bid: 07/11/2019
Purchasing Conference Room located at 800 East Overland, Room 300, El Paso, Texas 79901.
The project consists of but is not limited to the following: The water main improvements consist of the installation of approximately 22,200 lineal feet of 8-inch approved potable water pipe, approximately 4,700 lineal feet of 6-inch approved potable water pipe, approximately 44 – 8-inch Gate Valves, approximately 18 – 6-inch Gate Valves, approximately 33 fire hydrants, approximately 366 – ¾” water service connection and yard lines, trench safety system for the pipeline; pavement removal and replacement, SWPPP,videotaping of project site before and after construction, and a traffic control plan/operation. Q&A due by 07/15/19 at Noon. Bonds required.
County of El Paso, Texas
Oscar Avila
(915) 546-2048
(915) 546-8180
Published 07/02/2019 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.