ID 528078
Archived
Apache County
Owner Reference: SS2970
Bid Date: 03/04/2020 at 03:00pm
Estimate: $700,000
This project consists of the installation of approximately 4,200 linear feet of 6-inch DR 18 PVC and appurtenances from the Island Wastewater Treatment Plant to London Bridge Beach Park. This project will convert the irrigation water source at London Bridge Beach Park from potable water to reclaimed water. Dye testing at London Bridge Beach Park will be performed to confirm the source water. Signage will be installed around London Bridge Beach Park to alert the public of the reclaimed water supply. 120 calendar days
City of Lake Havasu, AZ
Jason Hart
(928) 854-0789
Login or create an account To view email
Published 02/10/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.