ID 698965
Archived
Mecklenburg County
Owner Reference: ITB 24-29
Bid Date: 04/02/2024 at 02:00pm
Trades: Elevator Contractor: Installation, Repairs & Related Building Equipment, *General Engineering Contractor GEC; Subcontractor Opportunities
This project is to install three pair of new moving walkways on Concourse E at Charlotte Douglas International Airport (“CLT”). The Contractor shall provide new conveying systems that will work with the existing pit conditions and configurations, noting that one pair will be shortened by approximately 30’ to improve passenger circulation. Removal and disposal of the moving walkways, temporary infill of the of the existing pits, and pit modifications required to the first pair of moving walkways (E-MW-01/E-MW-02) are part of the separate Concourse E Renovations project (currently underway) and thus are not part of this scope of work. As such, it is imperative that the Contractor closely coordinate with the Concourse E Renovations project through the CLT project manager. Bonds required.
City of Charlotte NC
Ryan Lingholm
Login or create an account To view email
Published 03/01/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.