**New Bid Date**RFB 5591 Mary Rhodes Pipeline Ph. 1 System Improvements, E13037, Corpus Christi, TX

Nueces County

Owner Reference: RFB 5591

Bid Date: 04/03/2024 at 03:00pm

Pre-Bid: 02/28/2024
Online via WebEx.com: Input meeting number (access code): 2661 352 2484; Input Meeting Password: 92v3MAVpd8y

Estimate: $9,367,000

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Machinery and Pumps Contractor, Pipeline Contractor: Water Mains, Sewer Lines, Wastewater Systems & Related Structures; Includes Pipe Inspection Camera, High Voltage Electrical Contractor (HVE): Power Lines, Street & Highway Lighting, Venues, Arenas, Utility, Transformers, Tank Construction, Repair & Pressure Washing: Fiberglass, Steel or Concrete Tanks - General Engineering Contractor, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal

The project scope of work includes: Furnish, install, test, and provide assistance during commissioning for improvements at the Bloomington and Woodsboro raw water booster pump stations that serve the City of Corpus Christi’s Mary Rhodes Pipeline. The work includes the following: Bloomington Booster Pump Station: • A new horizontal split-case centrifugal pump and associated pipe, valves, and fittings. • Two new medium voltage variable frequency drives (VFD), one for the new pump and one to replace an existing VFD on an existing pump. • Remove hydro-pneumatic valve actuators on the pump discharge flow control valves and replace with new electric motor valve actuators for four existing pump trains and one new pump train. • A new electro-magnetic flow meter within a new concrete vault, associated connections to the existing pipeline, and electrical and signal cabling and conduits. • New sump pumps: three in existing valve vaults and one in the new meter vault, and associated controllers, electrical and signal cabling, and conduits. • Sump pump discharge piping from the vaults to the existing water storage tank. • One new low voltage emergency generator and associated duct bank. • Two new outdoor air conditioning units, modifications to two existing air handler units, and associated modifications to ducting, louvers, wiring, and controls. • Replacement of heaved concrete panels adjacent to the storage tank. • Selective process mechanical, building mechanical, and electrical demolition. • Instrumentation and controls programming associated with the new pumps, pump control valves, and flow meters. Woodsboro Booster Pump Station: • One new medium voltage variable frequency drive (VFD) to replace an existing VFD on an existing pump. • Remove hydro-pneumatic valve actuators on the pump discharge flow control valves and replace with new electric motor valve actuators for four existing pump trains. • A new electro-magnetic flow meter within a new concrete vault, associated connections to the existing pipeline, and electrical and signal cabling and conduits. • New sump pumps: three in existing valve vaults and one in the new meter vault, and associated controllers, electrical and signal cabling, and conduits. • Sump pump discharge piping from the vaults to the existing water storage tank. • One new low voltage emergency generator and associated duct bank. • Two new outdoor air conditioning units, modifications to two existing air handler units, and associated modifications to ducting, louvers, wiring, and controls. • Selective process mechanical, building mechanical, and electrical demolition. • Instrumentation and controls programming associated with the new pumps, pump control valves, and flow meters. Bonds required. Prevailing wages.

City of Corpus Christi TX
 Clarissa Johnson
 Login or create an account To view email

Published 03/12/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.