ID 700607
Archived
Victoria County
Owner Reference: CSP-AW-3272024-Vine
Bid Date: 03/27/2024 at 11:00am
Pre-Bid: 03/19/2024
700 Main Center Building at 702 N. Main Street, Suite 205, Victoria, Texas.
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Plumbing Contractor: Water Supply, Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic Testing, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal, Fire Alarm, Fire Protection & Fire Suppression Contractor, Fire Pumps & Fire Hydrants
Vine Street Waterline Replacement Project includes replacing water lines, valves, fire hydrants, and water services Bonds required. Prevailing wages.
City of Victoria TX
Darrell Seibert
Login or create an account To view email
Published 03/17/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.