ID 697033

Archived

Richneck Elementary School Security Vestibule & Office Alterations, Newport News, VA

Newport News City County

Owner Reference: 011-0-2024/SNB

Bid Date: 03/07/2024 at 02:00pm

Pre-Bid: 02/21/2024
Richneck Elementary School, 205 Tyner Drive, Newport News, VA 23608

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities, High Voltage Electrical Contractor (HVE): Street & Highway Lighting, Venue/Arena Lights, Luminaires, Utility, Transformer Work, HVA - HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Air Handler/Air Chillers. Includes RTU's, Masonry Contractor, Precast Concrete, PLB - Plumbing Contractor: Water Supply & Connections, Water Heaters, Backflow testing, Leak Detection, Flow & Acoustic Monitoring, Drywall and Plastering Contractor

Newport News Public Schools is accepting bids for Richneck Elementary School Security Vestibule and Office Alterations at 205 Tyner Drive, Newport News, Virginia 23608. The work consists of constructing a one-story Vestibule addition, totaling approximately 900 S.F., at the main entrance of the existing Richneck Elementary School. Additionally, this project includes interior alterations at the adjacent main entrance, Lobby, Corridor and Administrative Offices. Work includes clearing and demolition at the existing entry canopy and adjacent yard, preparation of building pad, grading and drainage, and restoration of the site. New construction includes a steel-framed, brick and EIFS-clad structure with windows and doors, HVAC and electrical work. Interior work alters existing load-bearing and non-load-bearing masonry walls and partitions, and provides lintels or new openings, fire-rated HM storefronts and glass. Work includes interior demolition, provision of new interior wood casework, doors and frames, finishes, ceilings, plumbing, HVAC, lighting and electrical work. Additionally, work will include removal and replacement of the school’s main electrical distribution panel (MDP) at the Main Electrical Room. The new replacement panel, new electrical sub-panel and breakers shall be furnished by Newport News Public Schools and shall be installed by the Contractor. This work requires a shutdown of school power and coordination with Dominion Energy. The Contractor shall provide temporary power and for its own operations and to a limited area of the school for the duration of the outage. A separate project for replacement of the school’s HVAC systems by another contractor shall be underway during the course of this project. The completion schedule for this project is very demanding, and it is anticipated that extended workday hours and work on weekends will be necessary to complete this project by the scheduled completion date. Bonds required.

Newport News Public Schools VA
 Shannon Bailey
 Login or create an account To view email

Published 02/13/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.