Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

ID 16218

Archived

Archer Wetern

An Equal Opportunity Employer
is requesting quotations from all qualified
DBE, MBE, WBE
sub-contractors and/or material suppliers for the following project:

Dart Silver Line Regional Rail Project - US 75 Pedestrian Bridge
Silver Line Regional Rail Project

Owner: Dallas Area Rapid Transit

Bid Date:  09/18/2020 at 03:00 PM

We are requesting bids for the following trades and/or material suppliers:
Steel Bridge Erector, Steel Fabrication

Bid documents can be viewed at or obtained from:
Please contact Garrett Cole (e-mail [email protected]) for bridge details and bid sheet. Archer Western Herzog is tentatively scheduled to take delivery of the prefabricated bridge in June 2021.

Archer Western Herzog would like to request a proposals for the US 75 Pedestrian Bridge on the DART Silver Line Regional Rail Project in Carrollton, Texas. This request for proposal is for design, fabrication and delivery of a prefabricated weathering steel pedestrian bridge near US 75 and President George Bush Turnpike. Please contact Garrett Cole (e-mail [email protected]) for bridge details and bid sheet. Archer Western Herzog is tentatively scheduled to take delivery of the prefabricated bridge in June 2021. Proposals will be due by 3:00 pm September 18th, 2020. They can be emailed to [email protected] or mailed to 1548 Valwood Parkway, Suite 118, Carrollton, Texas 75006. Contact Garrett Cole, AWH Project Engr. e-maill [email protected]

Archer Wetern
1548 Valwood Parkway
Carrollton, TX 75006

Phone: (214) 585-7308
Email: [email protected]
Marvin Jackson

Published 9/09/2020 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: (888) 988-1208