Archer Wetern
An Equal Opportunity Employer
is requesting quotations from all qualified
DBE, MBE, WBE
sub-contractors and/or material suppliers for the following project:
Dart Silver Line Regional Rail Project - US 75 Pedestrian Bridge
Silver Line Regional Rail Project
Owner: Dallas Area Rapid Transit
Bid Date: 09/18/2020 at 03:00 PM
We are requesting bids for the following trades and/or material suppliers:
Steel Bridge Erector, Steel Fabrication
Bid documents can be viewed at or obtained from:
Please contact Garrett Cole (e-mail [email protected]) for bridge details and bid sheet. Archer Western Herzog is tentatively scheduled to take delivery of the prefabricated bridge in June 2021.
Archer Western Herzog would like to request a proposals for the US 75 Pedestrian Bridge on the DART Silver Line Regional Rail Project in Carrollton, Texas. This request for proposal is for design, fabrication and delivery of a prefabricated weathering steel pedestrian bridge near US 75 and President George Bush Turnpike. Please contact Garrett Cole (e-mail [email protected]) for bridge details and bid sheet. Archer Western Herzog is tentatively scheduled to take delivery of the prefabricated bridge in June 2021. Proposals will be due by 3:00 pm September 18th, 2020. They can be emailed to [email protected] or mailed to 1548 Valwood Parkway, Suite 118, Carrollton, Texas 75006. Contact Garrett Cole, AWH Project Engr. e-maill [email protected]
Archer Wetern
1548 Valwood Parkway
Carrollton,
TX 75006
Phone:
(214) 585-7308
Email: [email protected]
Marvin Jackson
Published 9/09/2020 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: (888) 988-1208