Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#17238 Archived

Reyes Construction

An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:

Reference
SOL548457
Project
Bayshore Bikeway: Barrio Logan Project
Location
San Diego
Owner
SANDAG
Bid Date
12/03/2021 at 02:00 PM

Scope / Description

We are requesting bids for the following trades and/or material suppliers:

Request for Sub-Bids, Sub-Proposals from firms with California DBE Certification: (Subcontractors)- Traffic Control, Surveying, Quality Control, Project Scheduling, Industrial Hygienist, Demolition, Minor Concrete, Minor Concrete Structures, Concrete Carrier Rail, Stamped Concrete, Reinforcing Steel, Dirt Import, Contaminated Soil Haulaway, Cold Mill Asphalt, Asphalt Paving, Landscape & Irrigation, Signage & Striping, Fencing & Handrail, Electrical, Traffic Signal, Street Lighting, Railroad Signal, Masonry Wall (Suppliers)- BMP Material, Traffic Control Equipment, Asphalt, Ready Mix Concrete, Aggregates, Misc. Metals, RCP, Handrailing, Detectable Warning Tiles, Waterworks Material, Plastic Pipe & Fittings, Filterra Unit
Project Scope: The work consists in general of approximately 2.3 miles of Class I bikeway along Harbor Drive between Park Boulevard and 32nd Street within the City of San Diego and Port of San Diego Tidelands. The bikeway will extend along the western side of Harbor Drive between Park Boulevard and Cesar Chavez Parkway. The bikeway will cross to the eastern side of Harbor Drive at Cesar Chavez Parkway, where it will extend to 32nd Street. Roadway improvements are required to accommodate the Class I bikeway. Features include raised concrete medians and buffers, concrete curb & gutter, asphalt concrete dike, curb extensions, concrete barrier railing, chain link fencing, street lighting, traffic signal modifications and other traffic safety measures linked to signage and striping. At the intersection of Harbor Drive and 32nd Street, the existing steel span pedestrian bridges will be removed, and the existing concrete abutments and stairs will be demolished. On 32nd Street, between Harbor Drive and Norman Scott Road, improvements include new sidewalk and medians, traffic signal improvements, and railroad signaling improvements for the MTS Trolley. Assistance will be available in obtaining bonds, lines of credit, insurance, necessary equipment, supplies, materials or related technical assistance.

Bid Documents

Bid documents can be viewed at or obtained from:

Plans, Specifications, and Contract requirements can be viewed online at no additional cost: 1. Via iSqFt – please send an email request to [email protected] 2.https://www.bidnetdirect.com/sandag

Contact

Reyes Construction

1383 S. Signal Drive
Pomona, CA 91766

Published 11/08/2021 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com

Phone: (888) 988-1208