Scope / Description
We are requesting bids for the following trades and/or material suppliers:
Sub Trades needed, but not limited to: LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), TIME-RELATED OVERHEAD (LS), DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY TRAFFIC STRIPE (TAPE), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM, TEMPORARY PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY EROSION CONTROL BLANKET, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY COVER, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY REINFORCED SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, WORK AREA MONITORING (BRIDGE), TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST (LS), NATURAL RESOURCE PROTECTION PLAN, INVASIVE SPECIES CONTROL, BIRD AND BAT EXCLUSION DEVICE, HYDROACUSTIC MONITORING, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, ROADWAY EXCAVATION (CLAY), (F) - STRUCTURE EXCAVATION (BRIDGE), (F) - STRUCTURE EXCAVATION (TYPE A), (F) - STRUCTURE EXCAVATION (TYPE D), (F) - STRUCTURE BACKFILL (BRIDGE), DITCH EXCAVATION, IMPORTED BORROW (CY), SOIL DECOMPACTION, ROADSIDE CLEARING, SOIL AMENDMENT, ORGANIC FERTILIZER, PLANT (GROUP H), PLANT (GROUP I), PLANT (GROUP M), PLANT (GROUP A), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, PLANT INDENTIFIER STAKES, TEMPORARY IRRIGATION SYSTEM, MOVE-IN/MOVE-OUT (EROSION CONTROL), IMPORTED TOPSOIL (CY), DUFF (SQFT), ROLLED EROSION CONTROL PRODUCT (NETTING), FIBER REINFORCED MATRIX, FIBER ROLLS, COIR BLOCKS, COIR LOGS, HYDRAULIC BIOTIC GROWTH MEDIUM, COMPOST (CY), COMPOST BERM, INCORPORATE MATERIALS, CLASS 2 AGGREGATE BASE (CY), REPLACE ASPHALT CONCRETE SURFACING, HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), ASPHALT BINDER (GEOSYNTHETIC PAVEMENT INTERLAYER), GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING FABRIC), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE D), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE BASE AND SURFACING, FURNISH STEEL PILING (HP 10 X 57), DRIVE STEEL PILE (HP 10 X 57), PRESTRESSING CAST-IN-PLACE CONCRETE, SEAL COURSE CONCRETE, (F) - STRUCTURAL CONCRETE, BRIDGE FOOTING, (F) - STRUCTURAL CONCRETE, BRIDGE, (F) - STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), (F) - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N), (F) - STRUCTURAL CONCRETE, DRAINAGE INLET, PRECAST CONCRETE BAT HABITAT (TYPE B), PTFE SPHERICAL BEARING, JOINT SEAL ASSEMBLY (MR 3"), JOINT SEAL ASSEMBLY (MR 5 1/2"), (F) - BAR REINFORCING STEEL (BRIDGE), (F) - BAR REINFORCING STEEL (GALVANIZED), (F) - HEADED BAR REINFORCEMENT, (F) - STRUCTURAL STEEL (HINGE TRANSVERSE SHEARKEY), REMOVABLE BAT HABITAT (TYPE A), BRIDGE REMOVAL, LOCATION A, BRIDGE REMOVAL, LOCATION B, 24" ALTERNATIVE PIPE CULVERT, 24" TEMPORARY CULVERT, 3" PLASTIC PIPE (EDGE DRAIN), 8" ENTRANCE TAPER, 8" ANCHOR ASSEMBLY, 8" ALTERNATIVE PIPE DOWNDRAIN, 10" WELDED STEEL PIPE CASING (BRIDGE), 30" ALTERNATIVE FLARED END SECTION, ABANDON CULVERT (LF), REMOVE OVERSIDE DRAIN, REMOVE CULVERT (LF), REMOVE HEADWALL, REMOVE FLARED END SECTION (EA), ADJUST FRAME AND GRATE TO GRADE, MODIFY INLET, ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), (F) - MISCELLANEOUS IRON AND STEEL, (F) - BRIDGE DECK DRAINAGE SYSTEM, PREPARE AND STAIN CONCRETE, 30" WELDED STEEL PIPE TRENCHLESS INSTALLATION (0.75" THICK), CHAIN LINK FENCE (TYPE CL-6), REMOVE FENCE, REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE-RECESSED), MARKER (CULVERT), REMOVE ROADSIDE SIGN, RESET ROADSIDE SIGN (ONE POST), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), ROADSIDE SIGN - ONE POST, ROADSIDE SIGN - TWO POST, MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), (F) - CHAIN LINK RAILING (TYPE 7 MODIFIED), TRANSITION RAILING (TYPE WB-31), ALTERNATIVE IN-LINE TERMINAL SYSTEM, (F) - CONCRETE BARRIER (TYPE 842 MODIFIED), REMOVE GUARDRAIL, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), 6" TRAFFIC STRIPE TAPE, 6" TRAFFIC STRIPE TAPE (BROKEN 36-12), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, 2" CONDUIT (BRIDGE), 3" CONDUIT (BRIDGE), FLASHING BEACON SYSTEM, MODIFYING TRAFFIC MONITORING STATIONS, MOBILIZATION
ALL ITEMS CAN BE BID IN FULL OR PARTIAL QUANTITIES.
Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project.
If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000.
Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $400 and covers the fiscal year (July 1 to June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
We are an Equal Opportunity Employer