Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#17670 Archived

FD Thomas, Inc.

An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:

Reference
15386
Project
Structure, Paving OR138: Lone Rock (Glide) Bridge and OR234: Dodge Bridge Project
Location
Various Highways, Various Counties
Owner
Oregon Department of Transportation
Bid Date
05/12/2022 at 09:00 AM

Scope / Description

We are requesting bids for the following trades and/or material suppliers:

Traffic Control: TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC; TEMPORARY SIGNS; FLAGGERS; TEMPORARY BARRICADES, TYPE III; TEMPORARY PLASTIC DRUMS; TEMPORARY IMPACT ATTENUATOR, TRUCK MOUNTED; REPAIR TEMPORARY IMPACT ATTENUATOR, TRUCK MOUNTED; PORTABLE TRAFFIC SIGNAL; PEDESTRIAN CHANNELIZING DEVICES; SIGNS, WIDE ANGLE SHEETING, SHEET ALUMINUM. Scaffolding/Access: TEMPORARY WORK ACCESS AND CONTAINMENT, BR NO 01245B (DODGE); TEMPORARY WORK ACCESS AND CONTAINMENT, BR NO 02496 (LONE ROCK). Environmental Control: POLLUTION CONTROL PLAN. Structural Steel Work: CONSTRUCTION SURVEY WORK; BRIDGE REMOVAL WORK; STRUCTURAL STEEL MAINTENANCE; RIVET AND BOLT REPLACEMENT; BRIDGE REMOVAL WORK; STRUCTURAL STEEL MAINTENANCE; RIVET AND BOLT REPLACEMENT; BRIDGE STRUCTURE MOUNTS. Striping: TEMPORARY FLEXIBLE PAVEMENT MARKERS; TEMPORARY NON-REFLECTIVE TAPE; TEMPORARY STRIPING; BI-DIRECTIONAL YELLOW TYPE IAR MARKERS; THERMOPLASTIC, SPRAYED, SURFACE, NON-PROFILED. Concrete Work: CLASS 2 PREPARATION FOR SCO INSTALLATIONS; STRUCTURAL CONCRETE OVERLAY MATERIAL; CONSTRUCT STRUCTURAL CONCRETE OVERLAY; SAW CUT TEXTURING; CONCRETE REMOVAL AT REINFORCING; CHLORIDE CONTAMINATED CONCRETE REMOVAL, 1 3/4 INCHES; COLD PLANE PAVEMENT REMOVAL, 1 3/4 - 2 INCHES DEEP; LEVEL 3, 1/2 INCH ACP MIXTURE. Joints: ELASTOMERIC CONCRETE NOSING; POURED JOINT SEAL.
F. D. Thomas Inc. is a union signatory contractor. Subcontractors must possess a current contractor's license, insurance coverage and worker's compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement, 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies. F. D. Thomas Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages.

Bid Documents

Bid documents can be viewed at or obtained from:

https://asrccorp-my.sharepoint.com/:f:/g/personal/sergey_andreev_fdthomas_com/Es9Lhe2uYshOkVVOr29SyTwBEAtpkzgVgOTJGfN9iGHkMQ?e=mTjmid

Contact

FD Thomas, Inc.

217 Bateman Dr
Central Point, OR 97502

Published 4/28/2022 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com

Phone: (888) 988-1208