SWPPP (Erosion and Sediment Control)
Survey
Clearing
Quality Control Testing
Cast-in-Place Concrete Structures
CLSM
Riprap
Asphalt Paving & Pavement Repair
Concrete Paving
Fences and Gates (Wire, Wood and temp)
Hydro-Mulching, Seeding and Sodding
Cathodic Protection
Testing and Disinfection of Water Main
Spoils Hauling/Trucking
Auger Boring
Hand Tunneling
Micro-Tunneling
Horizontal Direction Drilling (42inch Diameter)
Steel Casing/Tunnel Liner Plate
Tunnel Grouting annulus
Utility Marking/Potholing/Locating
DIP pipe, Bar wrapped Pipe & Steel Pipe
RCP Pipe and Concrete end section
Pipe Accessories (Valves, Fitting, etc.)
Precast manholes and vaults
CIP Storm Drain Headwalls
Traffic Control
Precast Concrete Revetment
Dewater and Groundwater Control
Welding
Aggregate Materials (Pipe Embedment, Flexbase, etc.)
Concrete Ready Mix Materials (Flow Fill, 2000psi, 3000psi, 4000psi)
NOTICE OF POTENTIAL SUBCONTRACT OPPORTUNITIES
Please take notice that on July 19, 2022, McKee Utility Contractors, Inc. will be submitting an evaluated proposal for the Phase 1B Segment D Pipeline, IFB Number 2021-005, project for the Alliance Regional Water Authority located in San Marcos, Texas. The Project generally consists of 18 miles of 42" Water Transmission Main and associated appurtenances located east of I-35 between San Marco, Texas and New Braunfels, Texas. It is the policy of McKee Utility Contractors, Inc. to promote and encourage subcontract opportunities for State of Texas certified Historically Underutilized Businesses (HUBs) in all subcontracts in compliance with Chapter 2161, Gov't Code.
The HUB participation goal for this Project is 11.2%. A qualifying Historically Underutilize Business must be registered with the State of Texas, City of Austin, or South Central Texas Regional Certification Agency. Eligible Potential subcontractors are encouraged to become HUB certified.
State of Texas HUB applications may be found at: https://comptroller.texas.gov/purchasing/vendor/hub/
The plans and specifications for the Project may be reviewed at https://www.civcastusa.com/ or are available by request from McKee Utility Contractors, Inc. All proposing subcontractors must submit their pricing proposal on or before 1:30 PM, Friday, July 15, 2022, to McKee Utility Contractors, Inc., 2309 W. Main Street, Prague, Oklahoma 74864 or to
[email protected]. If you have questions or require clarifications or assistance please contact Mr. William Geiser at (817) 505-8213.
McKee Utility Contractors, Inc. is an Equal Opportunity Employer.