Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#18019 Archived

John Madonna Construction Co., Inc.

An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:

Project
CT 05-1H8104 Roadway excavation, HMA, culverts and signal system
Location
05-SBt-25-18.8/19.2
Owner
Caltrans
Bid Date
12/14/2022 at 02:00 PM

Scope / Description

We are requesting bids for the following trades and/or material suppliers:

John Madonna Construction is requesting quotes from qualified subcontractors and suppliers, including those certified as DBE, for the following items of work, including, but not limited to: Lead Compliance Plan, CAS, Traffic Control System, Type III Barricade, Temporary Pavement Marking, Channelizer, Plastic Traffic Drums, Portable Radar Speed Feedback Sign System, PCMS, Temporary Radar Speed Feedback Sign System, Prepare SWPPP, REAP, Storm Water Sampling, Storm Water Annual Report, Move In/Move Out Temporary Erosion Control, Temporary Hydraulic Mulch, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Large Sediment Barrier, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Treated Wood Waste, Temporary High Visibility Fence, Clearing & Grubbing, Roadway Excavation, Roadway Excavation Topsoil, Subgrade Enhancement Geotextile, Roadside Clearing, 2” Galvanized Steel Pipe, 8” Plastic Pipe, Move In/Move Out Erosion Control, Rolled Erosion Control Product, Fiber Rolls, Compost Sock, Hydroseed, Compost, Compost Berm, Incorporate Materials, Class 2 Aggregate Base, HMA Type A, Place HMA Dike Type E, Tack Coat, Remove Asphalt Concrete Pavement, Cold Place Asphalt Concrete Pavement, Structural Concrete Headwall, Structural Concrete Drainage Inlet, 24” Alternative Pipe Culvert, 8” Perforated Plastic Pipe Underdrain, 6” Welded Steel Pipe, 24” Alternative Flared End Section, Inlet Depression, Remove Culvert, Remove Inlet, Remove Flared End Section, Rock Slope Protection, Rock Slope Protection Fabric, Miscellaneous Iron & Steel, Temporary Fence BW, Temporary Fence Wildlife Exclusion, Remove Fence, Relocate Gate, Delineator, Pavement Marker, Remove Roadside Sign, Furnish Single Sheet Aluminum Sign, Roadside Sign, Remove Guardrail, 6” Thermoplastic Traffic Stripe, 12” Rumble Strip, Temporary Signal Systems.
John Madonna Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE/SBE/DVBE firms for the aforementioned items of work. 100% Performance and Payment bonds may be required for the full amount of subcontract price. Subcontractors must be registered with the California DIR, possess a current contractors license, as well as insurance and workers compensation coverage meeting John Madonna Construction's requirements. Subcontractors will be required to sign John Madonna Construction's standard Subcontract Agreement. Plans and specifications are available via email. Please call for assistance with obtaining bonding, insurance, equipment, materials and/or supplies. John Madonna Construction is an Equal Opportunity Employer.

Bid Documents

Bid documents can be viewed at or obtained from:

Contact

John Madonna Construction Co., Inc.

P.O. Box 5310
San Luis Obispo, CA 93403

Published 11/07/2022 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com

Phone: (888) 988-1208