Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#18132 Archived
GOLDEN STATE BRIDGE, INC logo

GOLDEN STATE BRIDGE, INC

An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:

Reference
04-4J8504 / ACIM-2801(999)E
Project
CT 04-4J8504 Route 280 Install Column Casings, Concrete Barriers and Rock Slope Protection, San Mateo County, CA
Location
San Mateo County from Alpine Road to 280/380 Seperation
Owner
Caltrans Headquarters Sacramento (CADOT) CA
Bid Date
03/16/2023 at 02:00pm

Scope / Description

We are requesting bids for the following trades and/or material suppliers:

Sub Trades needed, but not limited to: LEAD COMPLIANCE PLAN, DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (TAPE), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY, TEMPORARY BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (EA), ALTERNATIVE TEMPORARY CRASH CUSHION TL-3, TEMPORARY TRAFFIC SCREEN, TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONSTRUCTION ROADWAY, STREET SWEEPING, TEMPORARY ACTIVE TREATMENT SYSTEM, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, STREAM RESTORATION HYDRAULIC MONITORING, TEMPORARY CREEK DIVERSION SYSTEMS, TREATED WOOD WASTE, REMOVE CONCRETE (SQYD), TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), CHANNEL EXCAVATION, (F) - STRUCTURE EXCAVATION (BRIDGE), (F) - STRUCTURE EXCAVATION (TYPE D), (F) - STRUCTURE BACKFILL (BRIDGE), NATIVE BACKFILL, ROADSIDE CLEARING, SOIL AMENDMENT, SLOW-RELEASE FERTILIZER, PLANT (GROUP H), PLANT (GROUP B), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, 2" WYE STRAINER ASSEMBLY, TREE WELL SPRINKLER ASSEMBLY, CAM COUPLER ASSEMBLY, (F) - 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), PRESSURE REGULATING VALVE, BALL VALVE, MOVE-IN/MOVE-OUT (EROSION CONTROL), IMPORTED TOPSOIL (CY), ROLLED EROSION CONTROL PRODUCT (NETTING), HYDROMULCH, FIBER ROLLS, COMPOST SOCK, HYDROSEED, COMPOST (CY), CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), (F) - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, (F) - STRUCTURAL CONCRETE, BRIDGE FOOTING, DRILL AND BOND DOWEL, (F) - BAR REINFORCING STEEL (BRIDGE), (F) - ASPHALT MEMBRANE WATERPROOFING, (F) - COLUMN CASING, TRASH NET (END OF PIPE CONNECTION), (F) - CLASS 2 PERMEABLE MATERIAL (BLANKET), REMOVE CONCRETE (CHANNEL), STRUCTURAL ROCK (ROCK GROUP A, PLACEMENT METHOD A), REMOVE SLOPE PAVING (SQYD), STRUCTURAL ROCK (ROCK GROUP B, PLACEMENT METHOD A), STRUCTURAL ROCK (ROCK GROUP C, PLACEMENT METHOD A), SLOPE PAVING (CONCRETE), REMOVE GABION (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ESM-1 (6" D50), PLACEMENT METHOD B, ESM-2, PONDING/ RODDING, CHAIN LINK FENCE (TYPE CL-4), 6' CHAIN LINK GATE (TYPE CL-4), REMOVE CHAIN LINK FENCE, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), TREATMENT BEST MANAGEMENT PRACTICE MARKER, MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), DOUBLE MIDWEST GUARDRAIL SYSTEM, SINGLE THRIE BEAM BARRIER, TRANSITION RAILING (TYPE STB), TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT-M), ALTERNATIVE CRASH CUSHION TL-3, CONCRETE BARRIER (TYPE 60M), CONCRETE BARRIER (TYPE 60MF), CONCRETE BARRIER (TYPE 60MS), (F) - CONCRETE BARRIER TRANSITION, REMOVE GUARDRAIL, REMOVE CONCRETE BARRIER, REMOVE THERMOPLASTIC TRAFFIC STRIPE, 6" TRAFFIC STRIPE TAPE (WARRANTY) (BROKEN 17-7), MOBILIZATION, ALL ITEMS CAN BE BID IN FULL OR PARTIAL QUANTITIES.
Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $400 and covers the fiscal year (July 1 to June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html. We are an Equal Opportunity Employer

Bid Documents

Bid documents can be viewed at or obtained from:

Plans for this project are available for review at the office of Golden State Bridge, Inc. 3701 Mallard Drive, Benicia, CA 94510 between the hours of 8:00 and 5:00 pm. The plans can be also be downloaded for free at http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php. If you would like the Plans and Specs emailed, please send your request to David Riccitiello at [email protected].

Contact

GOLDEN STATE BRIDGE, INC

3701 MALLARD DRIVE
BENICIA, CA 94510

Published 1/25/2023 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com

Phone: (888) 988-1208