Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#18363 Archived
GOLDEN STATE BRIDGE, INC logo

GOLDEN STATE BRIDGE, INC

An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:

Reference
01-0E11U4
Project
Structural Steel Bridge, Temp Bridge and Bar Reinforcing Steel
Location
Elk Creek Bridge in Mendocino County
Owner
State of California Department of Transportation
Bid Date
07/13/2023 at 02:00 PM

Scope / Description

We are requesting bids for the following trades and/or material suppliers:

Sub Trades needed, but not limited to: LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY TRAFFIC STRIPE (TAPE), CHANNELIZER (SURFACE MOUNTED), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS (LS), TEMPORARY BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (LS), ALTERNATIVE TEMPORARY CRASH CUSHION TL-3, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY EROSION CONTROL BLANKET, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY MULCH, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY REINFORCED SILT FENCE, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONSTRUCTION ROADWAY, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, WORK AREA MONITORING (BRIDGE), TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST (LS), NATURAL RESOURCE PROTECTION PLAN, FISH PROTECTION, INVASIVE SPECIES CONTROL, HYDROACOUSTIC MONITORING, BAT AND BIRD EXCLUSION DEVICES, TEMPORARY WILDLIFE EXCLUSION FENCE, TEMPORARY HIGH-VISIBILITY FENCE, TEMPORARY CONSTRUCTION MAT (LS), CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, CHANNEL EXCAVATION, SHOULDER BACKING, (F) - STRUCTURE EXCAVATION (TYPE D), (F) - STRUCTURE BACKFILL (BRIDGE), DITCH EXCAVATION, SELECTED MATERIAL (STREAM BANK), IMPORTED BORROW (CY), SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS B1, SUBGRADE ENHANCEMENT GEOGRID, GEOSYNTHETIC REINFORCEMENT, SOIL DECOMPACTION, PLANT (GROUP H), WOODY DEBRIS, SOD, PLANT ESTABLISHMENT WORK, MOVE-IN/MOVE-OUT (EROSION CONTROL), DUFF (SQFT), HYDRAULIC BIOTIC GROWTH MEDIUM, FIBER REINFORCED MATRIX (SQFT), FIBER ROLLS, COMPOST (CY), INCORPORATE MATERIALS, CLASS 2 AGGREGATE BASE (CY), CRACK TREATMENT, HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE BASE AND SURFACING, TEMPORARY BRIDGE (MODULAR BRIDGE SUPERSTRUCTURE), FURNISH STEEL PILING (HP 14 X 89), DRIVE STEEL PILE (HP 14 X 89), PRESTRESSING CAST-IN-PLACE CONCRETE, (F) - STRUCTURAL CONCRETE, BRIDGE FOOTING, (F) - STRUCTURAL CONCRETE, BRIDGE, (F) - STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), (F) - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ MODIFIED), STRUCTURAL CONCRETE, DRAINAGE INLET, DRILL AND BOND DOWEL, JOINT SEAL (MR 2"), (F) - BAR REINFORCING STEEL (BRIDGE), BRIDGE REMOVAL, BRIDGE REMOVAL (TEMPORARY BRIDGE SUBSTRUCTURE), 24" CORRUGATED STEEL PIPE (.138" THICK), 8" PERFORATED PLASTIC PIPE UNDERDRAIN, CLASS 3 PERMEABLE MATERIAL, 8" CORRUGATED STEEL PIPE DOWNDRAIN, FLUME DOWNDRAIN, 8" ENTRANCE TAPER, TAPERED INLET, 8" ANCHOR ASSEMBLY, 24" WELDED STEEL PIPE CASING (BRIDGE), REMOVE OVERSIDE DRAIN, (F) - SMALL-ROCK SLOPE PROTECTION, ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROOTWAD REVETMENT, (F) - MISCELLANEOUS IRON AND STEEL, (F) - MISCELLANEOUS METAL (BRIDGE), (F) - MISCELLANEOUS METAL (TSUNAMI UPLIFT ASSEMBLY), INSTALL CONDUIT TRENCH METHOD (4-2" HDPE), INSTALL CONDUIT TRENCH IN PAVEMENT METHOD (4-2" HDPE), FURNISH 8" CASING, CONDUIT ON STRUCTURE (4-2" TYPE 1), INSTALL VAULT (TYPE 3), INSTALL OBJECT MARKER (TYPE K-2(CA)), REMOVE FENCE, RESET GATE, REMOVE PAVEMENT MARKER, DELINEATOR (CLASS 1), GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), MARKER (CULVERT), REMOVE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), ROADSIDE SIGN - ONE POST, MIDWEST GUARDRAIL SYSTEM (STEEL POST), MIDWEST GUARDRAIL SYSTEM (8' STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), (F) - TUBULAR BICYCLE RAILING, PEDESTRIAN RAILING, TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT-M), ALTERNATIVE IN-LINE TERMINAL SYSTEM, ALTERNATIVE CRASH CUSHION SYSTEM, (F) - CALIFORNIA ST-75 BRIDGE RAIL (MODIFIED), REMOVE GUARDRAIL, 6" THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC PAVEMENT MARKING, 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, 6" TRAFFIC STRIPE TAPE WITH CONTRAST, TEMPORARY SIGNAL SYSTEMS, MOBILIZATION, ALL ITEMS CAN BE BID IN FULL OR PARTIAL QUANTITIES
Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000. Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $400 and covers the fiscal year (July 1 to June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html. We are an Equal Opportunity Employer

Bid Documents

Bid documents can be viewed at or obtained from:

Plans for this project are available for review at the office of Golden State Bridge, Inc. 3701 Mallard Drive, Benicia, CA 94510 between the hours of 8:00 and 5:00 pm. The plans can be also be downloaded for free at http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php. If you would like the Plans and Specs emailed, please send your request to David Riccitiello at [email protected].

Contact

GOLDEN STATE BRIDGE, INC

3701 MALLARD DRIVE
BENICIA, CA 94510

Published 5/24/2023 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com

Phone: (888) 988-1208