Scope / Description
We are requesting bids for the following trades and/or material suppliers:
FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE firms for the following scopes of work, including but not limited to: Lead Compliance Plan, Progress Schedule (Critical Path Method), Traffic Control System, Job Site Management, Construction Area Signs, Portable Changeable Message Sign, Prepare Water Pollution Control Program (WPC), Contractor-Supplied Leach Line Inspection, Prepare Asbestos Dust Mitigation Plan, Clearing and Grubbing, Remove Tree, Roadway Excavation, Erosion Control (Hydroseed), Imported Borrow, Rolled Erosion Control Product (Netting Type B), Class 2 Aggregate Base, Hot Mix Asphalt (Type A), Remove AC Dike, Install Roadside Sign On Existing Post, Inlet - Caltrans Type G1, Inlet - Caltrans Type G3, Adjust Frame & Grate to Grade, Adjust Valve Box Frame & Cover to Grade, Minor Concrete (Curb), "Minor Concrete - (Curb, Gutter, Sidewalk & Curb Ramp)", Minor Concrete (Textured Paving), Remove Concrete Curb, Pavement Marker (Type D, Retroreflective), Pavement Marker (Type G, Retroreflective), Salvage Roadside Sign, Relocate Roadside Sign (One Post), Roadside Sign - One Post, Tubular Hand Railing, Decorative Metal Hand Railing, Thermoplastic Crosswalk & Pavement Markings, "4"" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility)(Yellow)", "4"" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility)(White)", "8"" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility)(White)", Remove Traffic Stripe, Remove Pavement Marking, Rapid Flashing Beacon System, Radar Speed Feedback Sign Systems, Mobilization
A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Plans and specifications are also available for download at the Caltrans website at the following link: https://www.questcdn.com/cdn/posting/?keyword=8397746#. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.