GOLDEN STATE BRIDGE, INC
An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:
- Reference
- 50347 (Bid 2)
- Project
- SR-99 Corridor Bikeway Facility (Bikeway 99) Phase 5, 20th Street Bicycle/Pedestrian Over Crossing, Chico, CA
- Location
- Chico CA
- Owner
- City of Chico CA
- Bid Date
- 08/16/2023 at 04:00pm
Scope / Description
We are requesting bids for the following trades and/or material suppliers:
Sub Trades needed, but not limited to: Construction Surveys, Lead Compliance, Progress Schedule (Critical Path Method), Develop Water Supply, Construction Area Signs, Traffic Control System, Plastic Traffic Drums, Portable Changeable Message Sign, Temporary Railing (Type K), Temporary Crash Cushion, Job Site Management, Prepare Storm Water Pollution Prevention Plan (SWPPP), Rain Event Action Plan (REAP), Stormwater Sampling and Analysis Day, Storm Water Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Cover, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Silt Fence, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Invasive Species Control, Temporary High-Visibility Fence, Clearing and Grubbing, Remove Tree, Dust Palliative, Roadway Excavation, Roadway Excavation (Unsuitable Material), Structure Excavation (Rock), Structure Excavation (Bridge), Structure Excavation (Retaining Wall), Structure Backfill (Bridge), Structure Backfill (Controlled Low Strength Material), Structure Backfill (Slurry Cement), Structure Backfill (Retaining Wall), Imported Borrow, Brown Lava Rock, Remove Water Valve, Trees (Plant Group K), Shrubs (Plant Group A), Sod, Plant Establishment Work, Irrigation System, Hydroseed, Permanent Erosion Control Establishment Work, Class 2 Aggregate Base, Hot Mix Asphalt (Type A), Cold Plane Asphalt Concrete Pavement, Modular Block Wall, Temporary Shoring, Prestressing Cast-In-Place Concrete, Structural Concrete, Bridge Footing, Structural Concrete, Bridge, Structural Concrete, Bridge (Polymer Fiber), Structural Concrete, Retaining Wall, Structural Concrete, Drainage Inlet, Minor Concrete (Minor Structure), Concrete Surface Texture (River Cobble), Joint Seal (MR 2"), Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Retaining Wall), Bar Reinforcing Steel (Galvanized), Headed Bar Reinforcement, Furnish Structural Steel (Bridge), Erect Structural Steel (Bridge), Pedestrian Barricade, Remove Retaining Wall, Remove Asbestos Concrete Pipe, Remove Pipe, Remove Inlet, Adjust Frame and Cover to Grade, River Cobble, Rock Slope Protection (20 lb, Class I, Method A), Rock Slope Protection Fabric (Class 8), Minor Concrete (Type Al-6 Curb), Detectable Warning Surface, Minor Concrete (Vertical Curb and Gutter), Minor Concrete (Valley Gutter), Minor Concrete (Concrete Mow Strip), Minor Concrete (Sidewalk), Minor Concrete (Bikeway), Minor Concrete (Curb Ramp), Remove Concrete Curb, Remove Concrete (Mow Strip), Remove Concrete (Valley Gutter), Remove Concrete (Curb and Gutter), Miscellaneous Iron and Steel, Manhole Frame and Grate, Joint Seal Cover, Bike Wave Rack, Kiosk, Bike Gate, Wayfinding Sculpture, Prepare and Stain Concrete, Anti-Graffiti Coating, Parking Bumper (Precast Concrete), Temporary Fence (Type CL-6), Chain Link Fence (Type CL-6), 4' Chain Link Gate (Type CL-6), Remove Fence, Remove Sign, Roadside Sign - One Post, Install Sign (Strap and Saddle Bracket Method), Remove Bollard Post, Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, Painted Stall Lines and Pavement Markings, Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, Lighting System, Modifying Signal and Lighting Systems, Chain Link Railing (Type 7) (Mod), Chain Link Railing (Type 7) (Mod, 96"), Architectural Lighting (Main Bridge Arch), Mobilization, Furnish Structural Steel (Bridge) (Architectural Arch), Erect Structural Steel (Bridge) (Architectural Arch), Architectural Lighting (Architectural Arch), Pavilion Shelter, Decorative Boulders, Edging, Branding Insert (Metal)
ALL ITEMS CAN BE BID IN FULL OR PARTIAL QUANTITIES.
Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project.
If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000.
Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $400 and covers the fiscal year (July 1 to June 30th). To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.
We are an Equal Opportunity Employer
Bid Documents
Bid documents can be viewed at or obtained from:
Plans for this project are available for review at the office of Golden State Bridge, Inc. 3701 Mallard Drive, Benicia, CA 94510 between the hours of 8:00 and 5:00 pm. If you would like the Plans and Specs emailed, please send your request to David Riccitiello at [email protected].
Project information is also available at https://chico.ca.us/bid-project
Contact
GOLDEN STATE BRIDGE, INC
3701 MALLARD DRIVE
BENICIA,
CA 94510
- 925-372-8000
- [email protected]
- David Riccitiello
Published 7/13/2023 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com
Phone: (888) 988-1208