Scope / Description
We are requesting bids for the following trades and/or material suppliers:
FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE firms for the following scopes of work, including but not limited to: Lead Compliance Plan, Time-Related Overhead (Wday), Construction Area Signs, Traffic Control System, Type Iii Barricade, Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System Day, Temporary Barrier System, Portable Changeable Message Sign (Ls), Alternative Temporary Crash Cushion Tl- 3, Job Site Management, Prepare Water Pollution Control Program, Street Sweeping, Temporary Concrete Washout, Treated Wood Waste, Remove Concrete Block, Clearing And Grubbing (Ls), Roadway Excavation, Imported Borrow (Cy), Check And Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Remove Irrigation Facility, (F) - 1 1/4" Plastic Pipe (Schedule 40) (Supply Line), (F) - 2 1/2" Plastic Pipe (Class 315) (Supply Line), (F) - 3" Plastic Pipe (Class 315) (Supply Line), (F) - Pvc Pipe Conduit (Sleeve), Dry Seed (Sqft), Compost (Cy), Class 2 Aggregate Base (Cy), Minor Hot Mix Asphalt, Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Remove Asphalt Concrete Dike, Slope Paving (Concrete), Minor Concrete (Textured Paving), (F) - Anti-Graffiti Coating, Wrought Iron Fence, Wrought Iron Gate, Remove Chain Link Fence, Midwest Guardrail System (Steel Post), Vegetation Control Mat (Rubber), Double Midwest Guardrail System (Steel Post), Transition Railing (Type Wb-31), Rail Tensioning Assembly, End Anchor Assembly (Type Sft-M), Alternative In-Line Terminal Tl-3, Max-Tension Median Terminal, (F) - Concrete Barrier Transition, Remove Guardrail, Remove Concrete Barrier, Maintaining Existing Traffic Management System Elements During Construction, Mobilization
A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Plans and specifications are also available for download at the Caltrans website at the following link: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=10-1H5104. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.