Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#18680 Archived
George Reed, Inc. logo

George Reed, Inc.

An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:

Reference
GRI Bid No. 23-800
Project
State Route 88/Pine Grove Corridor Improvement Project, County Project No. 3000-5521, F.A.P. No. 10-0G550/HIPL-5926(066)
Location
Pine Grove, CA
Owner
County of Amador
Bid Date
12/07/2023 at 01:30pm

Scope / Description

We are requesting bids for the following trades and/or material suppliers:

Seeking All DBE Subcontractors/Suppliers needed for, including but not limited to: CONSTRUCTION AREA SIGNS; TRAFFIC CONTROL SYSTEM/TRAFFIC FLAGGERS; TEMPORARY RAILING; DEVELOP WATER SUPPLY; STRUCTURE EXCAVATION; STRUCTURE BACKFILL; HYDROSEEDING; EROSION CONTROL; TEMPORARY EROSION CONTROL; SEAL COAT; PLACE ASPHALT CONCRETE DIKE & MISC.; MINOR CONCRETE STRUCTURE; CONCRETE BLOCK & MASONRY RETAINING WALL; REINFORCING STEEL; ROADSIDE SIGN; REINFORCED CONCRETE PIPE; CORRUGATED METAL PIP (CSP); ROCK SLOPE PROTECTION; SAWCUTTING; FENCING; TEMPORARY FENCING; SURVEY OR HISTORICAL MONUMENT; CONCRETE BARRIER; PAINTED TRAFFIC STRIPING & MARKING; PAVEMENT MARKER; SIGNAL & LIGHTING; SIGNAL; LIGHTING; MATERIALS TESTING SERVICES; LAND SURVEYOR/LAND SURVEYING; CONSTRUCTION SCHEDULING; LEAD COMPLIANCE; SWPPP PLANNING; WATER TRUCK; STREET SWEEPING TRUCK; OIL ASPHALT SUPPLIER/ASPHALT OIL TANKERS; or any item of work or material you are qualified to perform or furnish. NON-DBE SUBS/SUPPLIERS: You will be expected to carry a proportionate percentage of 2nd-tier DBE participation with your quote.  Second-tier DBE participation will be evaluated with your price.

George Reed, Inc. is signatory to Operating Engineers, Laborers, and Cement Masons Unions.     100% Performance and Payment Bonds may be required for the full amount of subcontract price.     George Reed, Inc. will pay bond premiums of up to 2%. The subcontractor must possess current insurance and workers compensation coverage meeting Owner’s and GRI’s insurance requirements. Insurance waiver of subrogation is also required. Please call if you need assistance with bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials, or any related services; or assistance with breaking down items into economically feasible units or establishing flexible time frames for performance and delivery schedules to encourage or facilitate your participation. George Reed, Inc. is an Equal Opportunity Employer.

Bid Documents

Bid documents can be viewed at or obtained from:

Plans and specifications may be viewed in our office, at your local Builders Exchange, or can be obtained on-line from the City of Roseville's website at https://www.roseville.ca.us/business/procurement_services/bids_rfps

Contact

George Reed, Inc.

P.O. Box 4760
Modesto, CA 95352

Published 11/16/2023 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com

Phone: (888) 988-1208